Projects

  • Default
  • Title
  • Date
  • Random
  • The B Reservoir receives “clean” water directly from the district’s treatment plant; water is then distributed throughout the district. The
    Read More
  • In the wake of recent near failure of the Oroville Dam Spillway, the Division of Safety of Dams (California Department
    Read More
  • PID’s maintenance schedule calls for rehab of three of the districts water storage tanks, C, D and E. Maintenance rehab
    Read More
  • This project includes work to complete PID’s permitted water rights storage construction; Includes licensing of pre-1914 water storage right.
    Read More
  • Hazard mitigation to provide resilience to delivering water to Paradise
    Read More
  • Meter and service lateral replacement, including backflow prevention devices
    Read More
  • Replacement and hazard mitigation of current equalization tank used in water treatment
    Read More
  • Replacement of the Henson Rd Culvert damaged in the 2018 Camp Fire
    Read More
  • Mainline replacement project for mains damaged in the 2018 Camp Fire
    Read More
  •   Recovery Projects Paradise Irrigation District has identified needed projects to occur based on the damage from the 2018 Camp
    Read More