Requests for Proposals

PID Security Camera and System Removal and Replacement

Paradise Irrigation District is soliciting a request for bids for Security Camera and System Removal and Replacement with the following scope of work: 

The work at each site shall be performed in a manner consistent with industry practice and includes but may not be limited to the following details: 

- A hard-wired system managed by the video contractor.
- DVR system with web-based capabilities for viewing at each site location.
- Assessment of replacement of existing cameras as necessary.
- The addition or replacement of cameras at front entrances sufficient to identify people entering the building.
- Abilities to assign permissions to delegated reviewers with a minimum of 2 admins.
- Minimum of one week of memory for viewing footage.
- Cameras to be in full color and include night vision.

Request for quotes issued: September 9, 2022 

Due date for quotes: October 5, 2022 / 1:00 p.m. local time (extended)

pdf PID Security Camera and System Removal and Replacement Introduction, Scope of Work and Proposal Instructions (311 KB) pdf
(390 KB)

pdf Amendment 1 RFP Security Cameras Due date for quote submissions extended (197 KB)

For further information regarding this project, please contact: 

Mickey Rich, Assistant District Manager
Paradise Irrigation District
6332 Clark Road
Paradise, CA  95969-4146
Email: This email address is being protected from spambots. You need JavaScript enabled to view it. 

Water Treatment Plant Equalizer Tanks

Paradise Irrigation District is soliciting a request for proposal for Water Treatment Plant equalizer tanks with the following scope of work: 

Professional services to conduct an engineering study, design, environmental analysis, and permitting, for two new wash water equalization tanks at the Water Treatment Plant.  Each tank will have a 188,000-gallon capacity.  The project will involve study, design, and contract plans, including but not limited to final drawings, and specifications for the construction of the improvements.  Proposal Responses to this RFP will be received until 3:00 p.m., local time, on Monday, October 3, 2022.  Any proposals received after the specified date and time will not be accepted.  Consultants must submit two (2) originals with signatures, and one (1) electronic PDF version on a flash drive to the following address:

Paradise Irrigation District
Attn:  Georgeanna Borrayo, District Secretary
6332 Clark Road
Paradise, CA  95969-4146

Request for quotes issued: August 17, 2022 

Due date for quotes: October 3, 2022 / 3:00 p.m. local time 

pdf Water Treatment Plant Equalizer Tanks Introduction, Scope of Work and Proposal Instructions (390 KB)  
- pdf Addendum 1 - Water Treatment Plant Equalizer Tanks (1.21 MB)

pdf Addendum 2 - Response to Questions (266 KB)

For further information regarding this project, please contact: 

Blaine Allen, District Engineer
Paradise Irrigation District
6332 Clark Road
Paradise, CA  95969-4146
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.