Requests for Proposals

Mains Replacement Project - Phase 1

This is a public works project consisting of the installation of approximately 5.2 miles of water main, abandonment of existing water mains scheduled for replacement, replacement of damaged service laterals, reconnection of acceptable service laterals, installation of water meters, installation and testing of backflow prevention devices, reconnection to customer plumbing, installation of fire hydrants, site/surface restoration, and all related appurtenances to support the continued return of metered potable water service to the Paradise Irrigation District (PID, or DISTRICT). The project includes public notification of all scheduled work as it is conducted. The Project is intended to support rebuilding efforts following the Camp Fire of November 2018 and as a result will be structured to address locations based on community needs.

Date Issued: May 19, 2023 

Deadline: Wednesday, June 28, 2023 - 1:00 p.m. local time 

Mandatory Pre-Bid Meeting: Thursday, June 1, 2023 at 11:00 a.m.
Interested bidders should meet at the Paradise Irrigation District Board Room located at 6332 Clark Road, Paradise, CA 95969 

Proposal Responses: Sealed bids for the Mains Replacement Project should be addressed to:
Paradise Irrigation District
Attn: District Secretary 
6332 Clark Road
Paradise, CA 95969

Inquiries & Questions: Colleen Boak, PE, Water Works Engineers - This email address is being protected from spambots. You need JavaScript enabled to view it.

Documents: 
pdf Mains Replacement Project - Advertisement for Bids (960 KB)  
pdf Mains Replacement Project Technical Specifications (8.81 MB)
pdf Mains Replacement Project Drawings (22.86 MB)  

Meter Installation and Service Lateral Replacement - Phase 3

This is a public works project consisting of the installation of approximately 4,750 service laterals including excavation, valve installation and abandonment, new piping, angle stops, meter boxes, backfill and surface restoration.  In addition, this project includes the installation of approximately 3,150 meters and meter interface units, and 2,000 new or reconfigured backflow prevention assemblies and all related appurtenances to support the continued return of metered potable water service to the Paradise Irrigation District (PID, or DISTRICT).  The project includes public notification of all scheduled work as it is conducted.  The Project is intended to support rebuilding efforts following the Camp Fire of November 2018 and as a result will be structured to address locations based on community needs. 

Date Issued: March 20, 2023 

Deadline: May 3, 2023 - 1:00 p.m.

Proposal Responses: Sealed bids for the Meter Installation and Service Lateral Phase 3 (MISLR) Project should be addressed to:
Paradise Irrigation District
Attn: District Secretary 
6332 Clark Road
Paradise, CA 95969

A mandatory pre-bid meeting is scheduled for Thursday, March 30, 2023 at 10:00 a.m. 
Location: 6332 Clark Road, Paradise, CA 95969 

Inquiries & Questions: Colleen Boak, PE, Water Works Engineers - This email address is being protected from spambots. You need JavaScript enabled to view it.

Documents: 
pdf Meter Installation and Service Lateral Replacement - Phase 3
(7.13 MB)
spreadsheet Bidder Organizational Worksheet (16 KB)  
MISLR Phase 3 Project - Addendum 1
MISLR Phase 3 Project - Addendum 2 
MISLR Phase 3 Project - Addendum 3 
MISLR Phase 3 Project - Addendum 4 
MISLR Phase 3 Project - Addendum 5 
pdf Bid Summary - May 3, 2023 (31 KB)  
Notice of Intent to Award 

Previous Phase 1 & 2 Project Documents: 

Service Lateral Replacement Project (Phase 1) 

pdf Service Lateral Replacement Project Bid Documents (2019) (3.86 MB)
pdf Service Lateral Replacement Project - Addendum 1 (4.50 MB)
pdf Service Lateral Replacement Project - Addendum 2 (807 KB)  

Meter Installation and Service Lateral Replacement Project (Phase 2) 
pdf (5.24 MB) pdf MISLR Bid Documents (2021) (5.24 MB)
pdf MISLR Phase 2 Project - Addendum 1 (2.11 MB)
pdf MISLR Phase 2 Project - Addendum 2 (976 KB)